|
|
|
____________________
|
|
|
|
UKIRT PATT QUEUE STATUS
| UKIRT PATT
Queue Status |

|
CURRENT INSTRUMENT ISSUES
- UKIRT
will be closed from August 22 - September 9 (inclusive), so that the
primary mirror can be aluminized and WFCAM reinstalled. UKIRT will be
in Wide Field Mode after this until the start of December 2008. Click here
for general details of the timeline for
switching between UKIRT instrument modes.
- The Cassegrain mode is scheduled to be
available
again from December, 2008.
CURRENT QUEUE ISSUES
See above.
UPCOMING WEATHER
Mauna Kea
Weather Centre Forecast
QUEUE TABLE
This table shows the current
occupancy of the UKIRT
PATT-allocated queue. Projects are listed in order of decreasing TAG
grade. Projects are only listed if they have MSBs that have passed the
vetting process and which are currently
observable between UT hours 4 and 17 (6pm to 7am). The table is
currently updated at least
every Thursday (HST); check the document
date at the foot of the page and occasional indicators against each
item.
| Project |
Instrument |
Conditions |
Support |
msb# |
%complete |
Targets
Available (UT) |
WFAU
informed of completion?
|
U/08B/12
|
UFTI
|
t: <
5.00, s: < 0.60, cirr |
KERRT
|
3
|
30
|
(8, 14)
|
N/A
|
U/08B/20
|
UIST
|
t: <
0.15, s: < 1.50, phot
|
VARRICATTW
|
2
|
24
|
(13, 14)
|
N/A
|
U/08B/6
|
UIST
|
t: <
5.00,s: < 2.00, cirr
|
DAVISC |
5
|
5
|
< 7
|
N/A
|
Notes
[1] Conditions are
project TAG conditions, not MSB constrained
conditions. s:
seeing/arcsecond. t:
CSO
tau. Cloud cover indicated as
photometric, thin cirrus or any.
[2] MSB count reflects the MSB
returned from queries and not the number
of active MSBs in the science program.
[3] Availability is in
local-time integer hours.
RA COVERAGE
Current RA coverage of all active PATT MSBs:

|
|