Weather and Fault Statistics
The following tables present the weather loss and fault loss for semester 96B. Although semester 96B was extended to include February 1997, these tables only use the standard August through January statistics for compatibility with earlier tables. A hard disk crash in December meant that the December statistics are not available. Full details are stored on
database at the JAC. A more detailed description of how these tables are created is also available here.
Month Avail Extend Primary % Backup %
Hrs Hrs Loss Loss
August 422.5 17.8 19.5 4.6 11.5 2.7
September 464.0 28.4 19.4 4.2 18.2 3.9
October 448.0 13.2 73.2 16.3 63.7 14.2
November 456.0 9.5 196.5 43.1 177.0 38.8
December 488.0 6.8 198.0 40.6 199.5 40.9
January 464.0 14.5 134.7 29.0 126.7 27.3
Total 2742.5 90.2 641.3 23.4 596.6 21.8
Table 1: JCMT weather statistics.
Month Avail Total ANT INS COMP SOFT CAR OTH
August 422.5 60.8 0.3 55.5 1.4 2.4 0.8 0.5
September 464.0 14.7 0.0 9.7 1.5 2.9 0.0 0.6
October 448.0 6.8 0.0 1.4 3.5 0.9 0.0 1.0
November 456.0 7.6 2.1 2.5 2.2 0.2 0.3 0.3
December 488.0 20.1 0.1 0.4 0.8 10.5 8.0 0.3
January 456.0 7.1 0.4 5.3 0.3 0.9 0.0 0.3
P(hrs) 2742.5 117.1 2.9 74.8 9.7 17.8 9.1 3.0
B(hrs) 0.6 0.0 0.3 0.0 0.0 0.3 0.0
Table 2: JCMT fault statistics. Wherever possible the faults are categorised into ANT = antenna; INS = instrument; COMP = computer hardware; SOFT = software; CAR = carousel; with the remainder going to OTH = other. The figures in the table may not appear to add up correctly due to rounding in the original program. P defines the time lost from Primary projects.
The category B(hrs) is the time lost to Backup projects.