____________________
|
|
|
|
JAC Style guide: template
RxW
The commissioning dates for RxW are not yet known and unfortunately, as for previous semesters, the commissioning dates will be after the regular PATT deadline. It will not be possible to accept applications which specifically require the features and sensitivities of the RxW instrument. Therefore the D-band (690 GHz) section is not available for semester 97A. C-band observations can be applied for assuming that the project can be completed using the existing RxC2. If, and when, RxW is commissioned, all outstanding C-band applications will be transferred to use the new instrument.
Last Modification Date 1996/08/14 - Last Modification Author: Graeme Watt (gdw)
|
|