Weather and Fault Statistics for Semester 99B
The following tables present the weather loss and fault loss for semester 99B. A more detailed description of how these tables are created is also available here.
Month Available Extended ---- Lost to weather ----
Primary % Backup %
August 504.0 26.1 166.1 33.0 150.6 29.9
September 477.0 12.1 71.0 14.9 40.3 8.4
October 474.8 16.2 110.5 23.3 70.5 14.8
November 471.5 12.4 205.3 43.5 151.8 32.2
December 394.0 15.8 194.2 49.3 172.5 43.8
January '00 429.0 28.9 138.5 33.0 96.9 23.1
Totals 2741.3 111.7 885.6 32.3 682.6 24.9
Table 1: JCMT weather statistics.
Month Available Lost ANT INS COM SOF CAR OTH
August 504.0 15.9 0.5 8.8 0.0 2.8 1.0 1.9
September 477.0 49.4 31.0 4.9 0.2 4.4 0.0 9.0
October 474.8 29.9 3.0 25.7 0.0 0.2 0.0 1.0
November 471.5 65.4 0.0 63.9 0.0 1.4 0.0 0.2
December 394.0 5.9 0.5 0.0 0.0 1.9 1.5 2.0
January'00 420.0 14.0 0.3 8.6 2.4 0.9 0.3 1.0
P(hrs) 2741.3 179.6 35.3 111.9 2.6 11.6 2.8 15.1
B(hrs) 18.5 0.5 14.1 0.5 0.9 0.0 2.5
Table 2: JCMT fault statistics. Wherever possible the faults are categorised into ANT = antenna; INS = instrument; COMP = computer hardware; SOFT = software; CAR = carousel; with the remainder going to OTH = other. The figures in the table may not appear to add up correctly due to rounding in the original program. P defines the time lost from Primary projects. The category B(hrs) is the time lost to Backup projects.
Modified: 10 March 2000 by Graeme